Technical Assistance

Water Rights

In Kansas, a permit or certified water right is required before diverting water for any purpose other than domestic/household use. Water rights have conditions such as maximum rates of diversion and annual quantities of water, specific locations where diversion can occur, specific locations where water is to be used and specific beneficial uses of the water diverted. It is a violation of the law if water is not used in compliance of the conditions of a water right.

Water systems needing a explanation of the water rights they hold or assistance in maintaining compliance with their water rights are welcome to contact Kansas Rural Water Association.

Other Water Rights Links:
South Central Kansas Meter Order of January 19, 2007
Printer Friendly map of South Central Kansas Meter Order Location
DWR List of Certified Flow Meters
DWR Notice of Completion and Meter Installation Form
Meter Installation Information
KWO Water Demand Projections

Common Annual Water Right Deadlines:

    March 1
  1. Annual Water Use Report.
  2. Municipal Perfection Progress Report. (A one-time report for water right appropriations
    (permits) approximately 10 years old.)
    December 31
  1. Completion of Diversion Works Report. (A one-time report for each new well / pumpsite / dam / etc., under each file number.)
  2. Request for an Extension of Time to Complete Diversion Works.
  3. Perfection (Development) of Water Right.
  4. Request for an Extension of Time to Perfect Water Right.
  5. Installation of an Acceptable Water Flow Meter Report. (When required by an order issued by Chief Engineer. Meter repairs and replacements must be reported within 30 days of the repair or replacement. - See K.A.R. 5-1-10.)